Queensland · $247/mo
demo@devbrief.sample
Log out
Sample / illustrative — not live member data — not town planning or legal advice.
FLAG — Industry MIB verified on sampled Lot 2 SP346943; General Industry unverified. Lot 200 SP341456 carries flood + coastal overlays — per-allotment Flood Viewer checks required before EOI.

← Back to Today

Industrial release · MIB Sample pack

Hardwood Drive Stage 4, North Harbour Business Park, Morayfield QLD 4506

Industrial land release (12 allotments from ~3,579 m² to ~10,348 m² on listing). Price on application. EOI closes 15 Oct 2026 (as published).

Address / what it is

Industrial land release — marketed 12 shovel-ready allotments ~3,579–10,348 m². Price on application; EOI closes 15 Oct 2026. Estate parents sampled: Lot 2 SP346943 (~26.26 ha, Hardwood Drive / North Harbour Business Park); Lot 200 SP341456 (~18.25 ha). Individual Stage 4 lot/plans not separately confirmed this pass — confirm per contract lot.

Council planning

Lot 2 SP346943: Industry zone — Mixed industry and business precinct (verified on samples). Lot 200 SP341456: mixed map returns including Industry–MIB plus General residential – Next generation neighbourhood, Recreation and open space, and Rural residential fragments — treat as multi-zone parent; do not assume every Stage 4 allotment is MIB. Marketing “MIBA–General Industry” → General industry unverified on samples — verify per allotment on ePlan / MPLU.

What you can possibly put there

Marketed: shovel-ready industrial allotments for owner-occupier / developer / investor (warehouse / industry). Under Industry – Mixed industry and business, low-impact industry / warehouse-type uses are commonly code assessable where they meet scheme tables/codes — confirm use definition + codes per lot. Nearby Approved MCU DPs for Warehouse / Low Impact Industry / Medium Impact Industry evidence the estate is actively taking industry permits — not a substitute for an approval on the buyer’s lot.

Flood overlay

Lot 2 SP346943 centroid: flood hazard overlay none; overland flow none at centroid (large lot — re-check each Stage 4 lot polygon). Lot 200 SP341456: flood hazard Flood planning area, Medium risk flood hazard area, Balance flood planning area; plus overland flow path; coastal storm-tide Coastal planning area + Balance coastal planning area. Property flood-map keys: morayfield-north-east (RC + ST). Stage 4 contracts: run Flood Viewer per lot. Do not blanket “flood-free.”

Other associated constraints

Lot 2 centroid: Bushfire — High Potential Bushfire Intensity; Transport noise — Mandatory Category 2 (63 dB(A)); ASS land 5–20 m AHD (earlier point pass). Lot 200: bushfire High + Potential Impact Buffer; MLES waterway buffer; transport noise Mandatory Cat 1–2; ASS ≤5 m and 5–20 m AHD. Services-to-boundary / IC paid-to-60%-site-cover = listing marketing — Unknown / unverified.

Site readiness

North Harbour Stage 4 industrial release (Hardwood Drive) — Industry/MIB confirmed on sampled Lot 2 SP346943; General Industry and flood status must be confirmed per allotment before EOI (closes 15 Oct 2026 per listing).